Case Studies
Our Work
Real schemes, real constraints. Here’s how we’ve cleared, fenced, accessed and reinstated sites for utilities, Tier 1 contractors and Natural England.
- Land Remediation
- Stabilising and revegetating a steep, nutrient-poor chalk bank in Kent for a water undertaker.
- Arboriculture, Fencing, Land Remediation
- Vegetation removal, ecology mitigation, fencing and land remediation along a 60 km offshore wind cable route for J Murphy & Sons.
- Arboriculture, Fencing, Land Remediation
- Clearance, fencing and reinstatement on a 35 km cable route: 60 km of easement fenced, 1,575,000 m² reinstated, zero lost time injuries.
- Arboriculture, Fencing, Land Remediation
- Pre-entry devegetation, easement fencing and full reinstatement on a 20 km cross country pipeline scheme.
- Trackway
- A robust temporary access route across a football pitch so heavy plant and HGVs could safely reach the works.
- Arboriculture
- Sensitive clearance across protected wetland habitats for Natural England.
- Land Remediation
- Protecting a stream from silt during a water main valve repair, then shielding the bank with gabion baskets.